It is important that you have the following items with
you when applying for any zoning permit:
- A completely filled out application.
- A plot plan with actual lot dimensions clearly
visible and the proposed structure drawn on the plan.
- All permit fees.
PLEASE
SUBMIT THE FOLLOWING AS STATED IN SECTION 1001 OF THE GENOA TOWNSHIP ZONING
CODE WHEN APPLYING FOR A ZONING PERMIT FOR A NEW SINGLE FAMILY HOME. INFORMATION IN BLUE LETTERING HAS BEEN ADDED
AT THE END OF EACH SECTION FOR CLARIFICATION AND IS NOT PART OF THE GENOA
TOWNSHIP ZONING CODE.
Article X
Zoning Permits
and Certificates of Zoning Compliance
No
person shall establish or change any use of land nor locate, erect, construct,
reconstruct, enlarge or structurally alter any building or structure within
Genoa Township without first obtaining a zoning permit. No zoning permit shall be issued unless the
plans for the proposed building or structure or use of land fully comply with
the provisions of this Resolution, unless the Zoning Inspector receives a written
order from the Board of Zoning Appeals deciding an appeal, a variance, or
conditional use. A zoning permit shall
be required for all dwellings, all principal structures and uses, all accessory
structures, all accessory uses, and all temporary uses unless otherwise
specified. A zoning permit shall not be
required for the use of land for agricultural purposes, for buildings or
structures exclusively used for agricultural purposes, or for structures, not
including buildings, required in the provision of essential services.
Section
1001 Application
for Zoning Permit
All
zoning permit applications can be obtained from the Zoning Department and shall
be filled out completely and then submitted with the following required
information:
1001.01 Name, address, and phone
number of applicant.
1001.02 Date of application.
1001.03 Name, address, and phone
number of property owner.
1001.04 Name, address, and phone number of the person to contact
regarding information provided on the zoning permit application.
1001.05 A certified address, the name of the subdivision and the lot
number, or other information necessary to establish the location of the lot. (THIS IS
REQUIRED FOR ALL LOTS THAT ARE NOT IN A PLANNED DISTRICT SUBDIVISION.)
1001.06 A plot plan or site plan must be provided, drawn to scale and no
larger than 8½ “ x 14”, showing the actual shape and dimensions of the property
with front, rear, and side yard dimensions; the location and dimensions of
existing structures and proposed structures or alterations; and any additional
information required by the Zoning Officer.
(THIS MUST BE DRAWN TO SCALE & MUST SHOW
ALL SETBACKS)
1001.07 The number of proposed dwelling units and the total residential
floor area for each dwelling unit. (YOU MUST FILL IN 1ST & 2ND
FLOOR, AND GARAGE SQUARE FOOTAGES ON EACH ZONING PERMIT APPLICATION. ALSO INCLUDE BUILDING HEIGHT)
1001.08 A permit from the Delaware County Health Department or Ohio
Environmental Protection Agency for on site wastewater disposal, where
applicable, illustrating the location of primary and secondary leaching field
locations or proposed sanitary sewer hook ups and storm water inlets. (IF NOT
CONNECTING TO SEWER, YOU MUST HAVE A COPY OF SEPTIC PERMIT FROM DELAWARE COUNTY
HEALTH DEPARTMENT.)
1001.09 The proposed means of access, parking plan and number and
location of proposed off street parking spaces. (YOU MUST SHOW PROPOSED DRIVEWAY LOCATION
WITH WIDTH DIMENSIONS ON EVERY PLOT PLAN.
DRIVEWAYS MUST COMPLY WITH SECTION 539 OF THE GENOA TOWNSHIP
ZONING CODE. DRIVEWAY PERMITS ARE
ISSUED THROUGH DELAWARE COUNTY.)
1001.10 A detailed landscaping plan for a planned development district
or a plan for screening, when applicable. (LOT MUST BE SEEDED OR HAVE SOD LAID TO
OBTAIN FINAL CERTIFICATE OF COMPLIANCE)
1001.11 A statement by the applicant attesting to the truth and
exactness of all information supplied on the application.
1001.12 A zoning permit is valid for 12 months from the date the zoning
permit is issued unless otherwise stated on the zoning permit at the time of
issuance. If work has not been
completed during this time frame, the zoning permit shall expire and no further
work as described in the expired permit shall proceed unless and until a new
zoning permit has been obtained. A Certificate
of Zoning Compliance or a Temporary Certificate of Zoning Compliance must
be obtained prior to the 12-month zoning permit expiration and will not be
issued on any expired zoning permit.
1001.13 Such other information as may be necessary to determine conformance
with this Resolution. (A FOUNDATION LOCATION SURVEY IS REQUIRED WHEN
CONSTRUCTION IS PROPOSED WITHIN ONE (1) FOOT OF THE MINIMUM FRONT, REAR OR SIDE
SETBACKS. SURVEY MUST BE RECEIVED WHEN
FOUNDATION IS COMPLETE AND BEFORE FRAMING BEGINS.)
1001.14 A fee as established by the Township Trustees